edatoakrun
Posts: 5077
Joined: Thu Nov 11, 2010 9:33 am
Delivery Date: 15 May 2011
Leaf Number: 2184
Location: Shasta County, North California

Re: I Want my (fast) DC!

Sun Apr 22, 2018 12:14 pm

What is right about the caltrans proposal below:

About half of the DC sites are along fairly remote roads, effectively infilling existing or expected DC infrastructure, justifying direct governmental action, IMO.

What is wrong?

Almost everything else...

Incredibly expensive installations of single DC-chargers, often at poor sites w/o desirable amenities, "no user cost"... and already many years too late.


...In accordance with the Governor 's 2016 ZEV Action Plan, the 2017-18 State Budget, and
Senate Bill 1, the Department has identified 10 projects that will enable the Department to
upgrade Department-owned, publicly accessible facilities with Electric vehicle (EV)
infrastructure. These projects will upgrade 37 existing facilities, including 29 Safety Roadside
Rest Areas, four Maintenance stations, two District offices and one Park and Ride lot.
Improvements will upgrade electrical systems, construct charging station pads, purchase and
install EV chargers, complete environmental analysis, provide traffic control, complete
earthwork and trenching, provide asphalt and concrete work, ensure accessibility under the
Americans with Disabilities Act, and install signage and charging station striping. The project
locations are on priority highway corridors consistent with California Energy Commission
guidance, such as Interstates 5, 15 and 80, State Route 99, and U.S. Highways 101 and 395...


http://www.dot.ca.gov/hq/transprog/ctcl ... inking.pdf
no condition is permanent

GRA
Posts: 8367
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: I Want my (fast) DC!

Mon Apr 23, 2018 7:27 pm

edatoakrun wrote:What is right about the caltrans proposal below:

About half of the DC sites are along fairly remote roads, effectively infilling existing or expected DC infrastructure, justifying direct governmental action, IMO.

What is wrong?

Almost everything else...

Incredibly expensive installations of single DC-chargers, often at poor sites w/o desirable amenities, "no user cost"... and already many years too late. <snip>

Did you contact them and mention this?
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.