Gonewild wrote:I had my service entrance update when I got my solar panel installed the 200 amp panel cost about $2,300. I had a 125amp we upped it to 200amp. I hope this will help me get in the EV project. I signed up early on 4/20 and I live in AZ where the EV project company is located. I drive 38 miles one way to work daily. So I have info like I drive allot, its hot, I have a smart phone (iphone), internet and 200amp panel means it is cheap for them to install charger. Those are all the question they asked in the eval so I could have a good shot. I hope.


When they upgraded your service to 200 amp, did they hide all the wires in the walls and put the new panel 'in' your wall, or was everything installed 'on' your wall with conduit, etc? I'm just curious. When my solar went in, my service upgrade from 100 amp to 200 amp cost about the same, but they used conduit everywhere. I'm wondering if I should have said something or if that's standard ops.
:?:
JimmyD
http://www.jjhamilton.com/solar
Blue SL Leaf delivered 1/7/2011
EVP participant. EVSE: Blink
6.75kW PV solar

User avatar
LTLFTcomposite
Posts: 4105
Joined: Fri Apr 23, 2010 6:06 pm
Delivery Date: 10 Dec 2011
Leaf Number: 5926
Location: Boca Raton FL

Re: Interlopers

Sun May 23, 2010 3:58 am

Jimmydreams wrote:When they upgraded your service to 200 amp, did they hide all the wires in the walls and put the new panel 'in' your wall, or was everything installed 'on' your wall with conduit, etc? I'm just curious. When my solar went in, my service upgrade from 100 amp to 200 amp cost about the same, but they used conduit everywhere. I'm wondering if I should have said something or if that's standard ops.
:?:


The electricians probably wanted to do the job without having to call in a drywall trade. As Holmes on Homes would say "Come on, guys!"
LTL
White 2012 SV delivered 10 Dec 2011 returned 25 Nov 2014 replaced with stopgap ICE Sentra
[35 months] [35K miles] [9 Bars]
2013 Volt replaced after 36 months/30k miles with ICE Rogue

User avatar
evnow
Moderator
Posts: 11301
Joined: Thu Apr 22, 2010 11:41 am
Delivery Date: 25 Feb 2011
Leaf Number: 303
Location: Seattle, WA

Re: Interlopers

Sun May 23, 2010 8:09 am

Jimmydreams wrote:When they upgraded your service to 200 amp, did they hide all the wires in the walls and put the new panel 'in' your wall, or was everything installed 'on' your wall with conduit, etc? I'm just curious. When my solar went in, my service upgrade from 100 amp to 200 amp cost about the same, but they used conduit everywhere. I'm wondering if I should have said something or if that's standard ops.
:?:


The AV video about installing the EVSE shows a conduit - I think that is the std procedure.
1st Leaf : 2/28/2011 to 5/6/2013
2nd Leaf : 5/4/2013 to ?
Volt : 3/25/2017 to ?

User avatar
Gonewild
Posts: 1262
Joined: Wed Apr 28, 2010 5:05 pm
Delivery Date: 18 May 2011
Leaf Number: 229
Location: Chandler, AZ

Re: Interlopers

Sun May 23, 2010 8:25 am

Jimmydreams wrote:
Gonewild wrote:I had my service entrance update when I got my solar panel installed the 200 amp panel cost about $2,300. I had a 125amp we upped it to 200amp. I hope this will help me get in the EV project. I signed up early on 4/20 and I live in AZ where the EV project company is located. I drive 38 miles one way to work daily. So I have info like I drive allot, its hot, I have a smart phone (iphone), internet and 200amp panel means it is cheap for them to install charger. Those are all the question they asked in the eval so I could have a good shot. I hope.


When they upgraded your service to 200 amp, did they hide all the wires in the walls and put the new panel 'in' your wall, or was everything installed 'on' your wall with conduit, etc? I'm just curious. When my solar went in, my service upgrade from 100 amp to 200 amp cost about the same, but they used conduit everywhere. I'm wondering if I should have said something or if that's standard ops.
:?:


They had the power company remove the meter then they labeled all the wires. Then removed the box and put the new box in the same place as the old box. Feeding the wires back in the hole in the back of the box. Looks sweet.
Over 25,300 miles Plus - Now Sold/ Lease given back to Nissan 8-25-2012
Ordered Glacier Pearl Nissan Leaf SL eTech Edition on 8/31, Delivered March 1, 2011
POWERED By SunPower 5.16kw PV Solar home 3 Solar water panels.
Reserved 4/20

User avatar
Jimmydreams
Posts: 1500
Joined: Fri Apr 23, 2010 6:44 pm
Delivery Date: 08 Jan 2011
Leaf Number: 0175
Location: Oceanside, Ca.
Contact: Website

Re: Interlopers

Sun May 23, 2010 9:39 am

Gonewild wrote:They had the power company remove the meter then they labeled all the wires. Then removed the box and put the new box in the same place as the old box. Feeding the wires back in the hole in the back of the box. Looks sweet.


Thanks. I probably should have thought ahead and told them to hide everything. Oh well...now I know better for my next solar project!! :P