GRA
Posts: 9881
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Colorado EV Fast-Charging Corridor Grant Program

Wed Mar 13, 2019 4:14 pm

It has been a while since I last checked to see the progress on this, and they awarded a single grant for ALL SIX of the corridors to Chargepoint on Nov. 29th: https://www.colorado.gov/pacific/energyoffice/ev-fast-charging-corridor-grant-program

There's a map showing the locations of each of the sites and which corridor they belong to. These are all supposed to be operational within one year from the grant award.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

Return to “EVSE / Charging Equipment and Networks”