colemab
Posts: 7
Joined: Sun Jan 29, 2017 9:12 pm
Delivery Date: 23 Jan 2017

Re: Installing quick charge port

Mon Feb 13, 2017 10:12 am

This link:
http://www.nissan-global.com/EN/TECHNOLOGY/OVERVIEW/e_powertrain.html

Clarifies that the inverter is NOT part of the PDU. However, the inverter doesn't appear to be required to be swapped out in the 2015 model for the upgrade since it only "Converts direct-current electricity to alternate current when driving, utilizing the motor, and then recovers energy by converting alternate current to direct current during deceleration (regeneration)."

Further since it is below the PDU, it shouldn't have to be removed.