User avatar
DNAinaGoodWay
Posts: 2736
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Shell to start installing QC at its gas stations.

Wed Feb 01, 2017 5:47 am

https://electrek.co/2017/02/01/shell-el ... ign=buffer

Sooner the better. They have the means to transition. I hope it starts a trend.
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

Return to “EVSE / Charging Equipment and Networks”