Re: Electrify America Network

Tue May 22, 2018 5:11 pm

Via GCC:
Electrify America partners with Simon to install ultra-fast EV chargers at more than 30 shopping centers in US
http://www.greencarcongress.com/2018/05/20180522-simon.html

Electrify America is teaming up with Simon, a global leader in premier shopping, dining, entertainment and mixed-use destinations, to install electric vehicle charging stations at more than 30 Simon centers throughout the US. . . .

The first installation will open in early June at Gulfport Premium Outlets in Gulfport, Mississippi. Other notable Simon locations that will receive Electrify America charging stations include King of Prussia (Philadelphia, PA), San Francisco Premium Outlets (San Francisco, CA), Del Amo Fashion Center (Los Angeles, CA), Ontario Mills (Ontario, CA), Santa Rosa Plaza (Santa Rosa, CA), Florida Mall (Orlando, FL) and South Shore Plaza (Braintree, MA). . . .

At the Simon locations near major highways, Electrify America’s chargers will have a range in power from 50 kW up to 350 kW. Other Simon facilities will offer a range of power from 50 kW to 150 kW, as well as an L2 AC charger to accommodate plug-in hybrids and non-DC-charge capable EVs at most locations.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 8884
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue May 22, 2018 5:13 pm

garybluetree wrote:I was at the Target in East Palo Alto, CA, today I saw what looked like new chargers being installed. Are these part of the Electrify America network?

You'd be most likely to know, but as noted upthread Target is one of the corporations which EA is working with.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GetOffYourGas
Posts: 1839
Joined: Tue Dec 20, 2011 6:56 pm
Delivery Date: 09 Mar 2012
Location: Syracuse, NY

Re: Electrify America Network

Wed May 23, 2018 8:32 am

GRA wrote:
garybluetree wrote:I was at the Target in East Palo Alto, CA, today I saw what looked like new chargers being installed. Are these part of the Electrify America network?

You'd be most likely to know, but as noted upthread Target is one of the corporations which EA is working with.


Right. Could very well be EA. It would be worth investigating a little. Maybe snap a picture or two, talk to the Target manager, etc if you are curious.
~Brian

EV Fleet:
2011 Torqeedo Travel 1003 electric outboard on a 22' sailboat
2012 Leaf SV (traded for Bolt)
2015 C-Max Energi (302A package)
2017 Bolt Premier

garybluetree
Posts: 2
Joined: Sun Jan 08, 2012 9:14 pm
Delivery Date: 31 Dec 2011
Leaf Number: 7009

Re: Electrify America Network

Wed May 23, 2018 12:30 pm

I did take two photos. Finally got a chance to upload them. They do not look like any of the chargers Electrify America is using. There are also no locations in California on their list of "Coming Soon". I guess these are part of another network.
https://photos.google.com/u/1/photo/AF1QipNDW8OejpNuLwrdyzPuUhBSPdBBgI8fNMy1BHW6
https://photos.google.com/u/1/photo/AF1QipNl4yGTHY-1QnfzhmPwU_U94h6XB93QUAbkRBjM
Last edited by garybluetree on Wed May 23, 2018 12:45 pm, edited 1 time in total.

GetOffYourGas
Posts: 1839
Joined: Tue Dec 20, 2011 6:56 pm
Delivery Date: 09 Mar 2012
Location: Syracuse, NY

Re: Electrify America Network

Wed May 23, 2018 12:39 pm

Both image links are broken
~Brian

EV Fleet:
2011 Torqeedo Travel 1003 electric outboard on a 22' sailboat
2012 Leaf SV (traded for Bolt)
2015 C-Max Energi (302A package)
2017 Bolt Premier

GRA
Posts: 8884
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Jun 07, 2018 5:19 pm

Via GCC:
Electrify America picks Black & Veatch, SAI Group as design-build firms for EV fast charging stations
http://www.greencarcongress.com/2018/06/electrify-america-picks-black-veatch-sai-group-as-design-build-firms-for-ev-fast-charging-stations.html

. . . Black & Veatch and SAI Group each plan to manage the full design, permitting, and construction process in order to deploy more than 2,000 DC fast chargers across 484 sites at or near retail, dining, parking, and other facilities that offer convenience and amenities for EV drivers. All the sites will be installed or under development by June 2019.

Black & Veatch, which specializes in the deployment of energy, water, telecommunications, and smart city infrastructure, has been awarded the site design and construction of Electrify America’s ultra-fast charging stations in 24 states in the Pacific Northwest, Mountain, Central, Midwest, Southeast Central and Southeast regions. Black & Veatch will also construct sites in California, where the company maintains a regional office and has created thousands of jobs.

SAI Group, which has performed work in Alaska, Hawaii, and most states in the continental United States, has been awarded design-build responsibilities for Electrify America’s ultra-fast charging stations in 16 states in the Northeast, Mid-Atlantic, South-Central, and Southwest regions.

Currently four sites are open, with 18 more 'Coming Soon', which hopefully means ''Under Construction' or at least 'Permitted' rather than "We hope to do it, sometime".
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

DaveinOlyWA
Posts: 13081
Joined: Sat Apr 24, 2010 7:43 pm
Delivery Date: 16 Feb 2018
Leaf Number: 314199
Location: Olympia, WA
Contact: Website

Re: Electrify America Network

Fri Jun 08, 2018 10:34 am

4 sites open. Any of them have more than one chademo?
2011 SL; 44,598 miles. 2013 S; 44,840 miles.2016 S30 deceased. 29,413 miles. 2018 S40; 8743 miles, 485 GIDs, 37.6 kwh 111.39 Ahr , SOH 96.49, Hx 114.98
My Blog; http://daveinolywa.blogspot.com" onclick="window.open(this.href);return false;

finman100
Posts: 328
Joined: Thu Sep 20, 2012 10:42 am
Delivery Date: 06 Jun 2014
Location: Albany, OR

Re: Electrify America Network

Fri Jun 08, 2018 11:07 am

all right! only one more year to go!

uhhhhgg, and I'll guess one stall per DC charger location, with NO enforcement of anti-ICEing laws, and overpriced to boot. win-win-win????

Oh, and low 22-30 kW power. NOT fast. gee, what a great way to get more EVs on the road!

Let's see where this lands in the upcoming 365 days.

I'm such a pessimist when it comes to these type of projects. I've been disappointed for 4 years...
Albany, Oregon
2014 Silver SV with charge/LED package. June 2014, I'm in the EV game!
46,000 miles
17.5 kWh on 100% charge (51-ish Ah), down 1 bar
4.2 miles/kWh average
Best trip: all of 'em. They're all no-gas!

DaveinOlyWA
Posts: 13081
Joined: Sat Apr 24, 2010 7:43 pm
Delivery Date: 16 Feb 2018
Leaf Number: 314199
Location: Olympia, WA
Contact: Website

Re: Electrify America Network

Fri Jun 08, 2018 11:13 am

finman100 wrote:all right! only one more year to go!

uhhhhgg, and I'll guess one stall per DC charger location, with NO enforcement of anti-ICEing laws, and overpriced to boot. win-win-win????

Oh, and low 22-30 kW power. NOT fast. gee, what a great way to get more EVs on the road!

Let's see where this lands in the upcoming 365 days.

I'm such a pessimist when it comes to these type of projects. I've been disappointed for 4 years...


Hate to rain on your parade but the SLOWEST station so far is 50 KW and even those are scheduled to be upgraded later
2011 SL; 44,598 miles. 2013 S; 44,840 miles.2016 S30 deceased. 29,413 miles. 2018 S40; 8743 miles, 485 GIDs, 37.6 kwh 111.39 Ahr , SOH 96.49, Hx 114.98
My Blog; http://daveinolywa.blogspot.com" onclick="window.open(this.href);return false;

finman100
Posts: 328
Joined: Thu Sep 20, 2012 10:42 am
Delivery Date: 06 Jun 2014
Location: Albany, OR

Re: Electrify America Network

Fri Jun 08, 2018 11:16 am

yep, exactly.

ALL the DC fast chargers here in Oregon are "50 kW". I don't ever see that charging. maybe 40 kW for 2 minutes. LeafSpy has a way of showing what's going on. VERY typically it's 30 kW or lower, EVEN at a 15% charge status. oh well. at least upgrades are coming "later" (rolling eyes).
Albany, Oregon
2014 Silver SV with charge/LED package. June 2014, I'm in the EV game!
46,000 miles
17.5 kWh on 100% charge (51-ish Ah), down 1 bar
4.2 miles/kWh average
Best trip: all of 'em. They're all no-gas!