GetOffYourGas
Posts: 1945
Joined: Tue Dec 20, 2011 6:56 pm
Delivery Date: 09 Mar 2012
Location: Syracuse, NY

Re: Electrify America Network

Sat Nov 17, 2018 10:21 am

GRA wrote:
Nevertheless, the Brothers were ecstatic when Benito Mussolini took the film as a personal insult and banned it in Italy.[7][25] Also, the residents of Fredonia, New York, protested because they feared that the similar-sounding nation would hurt their city's reputation. The Marx Brothers took the opposite approach, telling them to change the name of their town to keep from hurting their movie.

Lol! Touché!
~Brian

EV Fleet:
2011 Torqeedo Travel 1003 electric outboard on a 22' sailboat
2012 Leaf SV (traded for Bolt)
2015 C-Max Energi (302A package)
2017 Bolt Premier

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Nov 21, 2018 4:59 pm

Two more QCs are open, for 11 this month and 40 total: Elk Grove, CA (suburb south of Sacramento on SR 99, and #2 in CA); Wichita, KS (I-35, a bit far from I-135).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sun Nov 25, 2018 5:02 pm

Williamsburg, KY (I-75) is open, for 12 this month and 41 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Nov 28, 2018 5:39 pm

Memphis, TN (near Jct. I-40/US. 64) is open, making 13 this month and 42 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sat Dec 01, 2018 12:45 pm

6 more open, for 18 in November and 48 total: Missoula, MT! (U.S. 93 off I-90; work must have been fun in November); Littleton, CO (S.R. 470 off U.S. 285, also not pleasant); Spring, TX (I-45 N. of Houston); Springfield, IL (Jct. I-55/I-72); Bushnell, FL (I-75, west of Orlando and N. of Tampa); Pooler, GA (I-95 N. of I-16 Jct., WNW from Savannah).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Dec 03, 2018 4:58 pm

Council Bluffs, IA (Jct. I-80/I-29) is open, the first of the month and 49 total. You could drive I-80 from Denver to Des Moines now, although the return would require care between North Platte and Ft. Morgan.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue Dec 04, 2018 6:33 pm

Mt. Vernon, IL ( Jct. I-57 & 64) is open, #2 for the month and #50 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Fri Dec 07, 2018 4:50 pm

GCC:
Simon and Electrify America launch California’s first 350 kW EV charging stations
https://www.greencarcongress.com/2018/12/20181206-simon.html

Simon . . . announced that its San Francisco Premium Outlets is California’s first location for electric vehicle (EV) charging systems featuring fast recharging speeds up to 350 kilowatts (kW) from Electrify America.

Simon teamed with Electrify America to open 10 DC fast chargers at San Francisco Premium Outlets for public use. The charging site features eight 150 kW chargers and two 350 kW chargers. The 350 kW chargers are capable of recharging an electric vehicle at 20 miles a minute providing 200 miles of vehicle driving range in just 10 minutes.

The 10 Electrify America chargers are co-located with 20 Tesla Superchargers making San Francisco Premium Outlets one of the nation’s largest multi-standard fast charging sites.

In addition to San Francisco Premium Outlets, Electrify America will install charging systems at Simon locations nationwide including 17 centers in California, with 95 additional chargers.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 9518
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Fri Dec 07, 2018 5:47 pm

Livermore, CA is open, #3 for the month and #51 total (#3 for CA).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

DaveinOlyWA
Posts: 13338
Joined: Sat Apr 24, 2010 7:43 pm
Delivery Date: 16 Feb 2018
Leaf Number: 314199
Location: Olympia, WA
Contact: Website

Re: Electrify America Network

Fri Dec 07, 2018 6:23 pm

https://ww2.arb.ca.gov/ma121318?utm_med ... ovdelivery

Here's your chance to put in your 2 cents. I personally think EA is building a network that favors VW and all but ignores Chademo since they do not provide a single chademo exclusive station. I am ok with that as long as they do what EVGO did and simply make all their stations dual format. As it stands now, it is possible for single CCS EV to block a chademo EV from using the charging station despite there being several CCS options available at each location.
2011 SL; 44,598 miles. 2013 S; 44,840 miles.2016 S30 deceased. 29,413 miles. 2018 S40; 11,987 miles, 485 GIDs, 37.6 kwh 110.89 Ahr , SOH 96.00, Hx 115.22
My Blog; http://daveinolywa.blogspot.com" onclick="window.open(this.href);return false;

Return to “EVSE / Charging Equipment and Networks”