Fri Nov 06, 2015 12:56 pm

pksd1 wrote:Placed an order for "J-Plug - J1772 40 Amp Plug" with QCP. Looking forward to getting my blink EVSE fixed. Hate driving my backup ICE car. No word from Blink support, after initial contact !!


No chance of using your portable EVSE that came with the car?
--
JP White
http://jpwhitenissanleaf.com
Blue SL-e, Res 4/22/10, Ord 3/29/11, Del 7/30/11
110,000 Miles.
Lost 5 Capacity bars
7/18/13 (29,206), 8/25/14 (51,728), 7/12/15 (71.108), 5/12/16 (88,362), 10/17/16 (96,532)
New Battery 12/3/16 (98,956)

Valdemar
Posts: 2407
Joined: Tue May 10, 2011 10:32 pm
Delivery Date: 09 Sep 2011
Location: Oak Park, CA

Re: Official EV Project / Ecotality / free charger thread

Fri Nov 06, 2015 1:15 pm

TonyWilliams wrote:I can absolutely guarantee that our J-Plug cable is the most flexible and lightest of any 30 amp or higher rated cable.

http://shop.quickchargepower.com/J-Plug ... JPC40A.htm

As stated above, ours product is custom made, so the wires are different that other "off-the-shelf" products.

There are 8 total conductors (40 amp):

2) Black - Line 1 (12 gauge)
2) Red - Line 2 (12 gauge)
1) Green - Ground (12 gauge)
1) Purple - Pilot pin (18 gauge)
1) Blue - not used (18 gauge)
1) Orange - not used (18 gauge)



Is single #12 ground legit for 40 amps? NEC calls for #10. There is also a rule for up-sizing the grounding conductor when the current carrying conductors are oversized relative to the OCPD, unsure if it applies here due to 2x#12s.
'11 SL, totaled
-1CB@33k/21mo, -2CB@53k/33mo, -3CB@68k/41mo, -4CB(41.5AHr)@79k/49mo, -5CB(38.85AHr)@87.5k/54mo
-0CB(66.14AHr)@87.5k/54mo (BBB)
59.7AHr, SOH 93%, 118k miles
9kW Solar

pksd1
Posts: 247
Joined: Mon May 03, 2010 6:47 pm
Delivery Date: 22 Apr 2011
Leaf Number: 565
Location: San Diego (Rancho Penasquitos)

Re: Official EV Project / Ecotality / free charger thread

Fri Nov 06, 2015 1:52 pm

JPWhite wrote:
pksd1 wrote:Placed an order for "J-Plug - J1772 40 Amp Plug" with QCP. Looking forward to getting my blink EVSE fixed. Hate driving my backup ICE car. No word from Blink support, after initial contact !!


No chance of using your portable EVSE that came with the car?


My 112v does not come with EV rates, don't want to end up in tier-3 of standard DR rates. But I might still charge the car over the weekend and dive to work on Monday :)
#1 Blue SL-ETEC
Delivered: Earth Day 2011 - April 22 -upgraded to LEAF#2 after two years
#2- 2013 Dark grey- SL - April 2013 - Leased

User avatar
JPWhite
Gold Member
Posts: 1751
Joined: Sun Jul 31, 2011 3:41 pm
Delivery Date: 30 Jul 2011
Leaf Number: 5734
Location: Hendersonville TN
Contact: Website WLM Yahoo Messenger AOL

Re: Official EV Project / Ecotality / free charger thread

Fri Nov 06, 2015 5:01 pm

pksd1 wrote:
JPWhite wrote:
pksd1 wrote:Placed an order for "J-Plug - J1772 40 Amp Plug" with QCP. Looking forward to getting my blink EVSE fixed. Hate driving my backup ICE car. No word from Blink support, after initial contact !!


No chance of using your portable EVSE that came with the car?


My 112v does not come with EV rates, don't want to end up in tier-3 of standard DR rates. But I might still charge the car over the weekend and dive to work on Monday :)


Ah OK. In that case it may pay to have your portable EVSE upgraded by evseupgrade.com at some point in the future. You can get a pigtail to fit the 6-50 220v outlet therby having a backup to your dedicated EVSE. I never missed a beat when my Blink started acting up. I've used the 240v capability of my portable EVSE at many locations (mostly campgrounds). It's a good upgrade.
--
JP White
http://jpwhitenissanleaf.com
Blue SL-e, Res 4/22/10, Ord 3/29/11, Del 7/30/11
110,000 Miles.
Lost 5 Capacity bars
7/18/13 (29,206), 8/25/14 (51,728), 7/12/15 (71.108), 5/12/16 (88,362), 10/17/16 (96,532)
New Battery 12/3/16 (98,956)

pksd1
Posts: 247
Joined: Mon May 03, 2010 6:47 pm
Delivery Date: 22 Apr 2011
Leaf Number: 565
Location: San Diego (Rancho Penasquitos)

Re: Official EV Project / Ecotality / free charger thread

Mon Nov 09, 2015 10:50 am

JPWhite wrote:
pksd1 wrote:
JPWhite wrote:
No chance of using your portable EVSE that came with the car?


My 112v does not come with EV rates, don't want to end up in tier-3 of standard DR rates. But I might still charge the car over the weekend and dive to work on Monday :)


Ah OK. In that case it may pay to have your portable EVSE upgraded by evseupgrade.com at some point in the future. You can get a pigtail to fit the 6-50 220v outlet therby having a backup to your dedicated EVSE. I never missed a beat when my Blink started acting up. I've used the 240v capability of my portable EVSE at many locations (mostly campgrounds). It's a good upgrade.



Unfortunately my LEAF is a lease, not sure the dealer would appreciate me messing with the original charger when I turn the car back in next year.
#1 Blue SL-ETEC
Delivered: Earth Day 2011 - April 22 -upgraded to LEAF#2 after two years
#2- 2013 Dark grey- SL - April 2013 - Leased

pksd1
Posts: 247
Joined: Mon May 03, 2010 6:47 pm
Delivery Date: 22 Apr 2011
Leaf Number: 565
Location: San Diego (Rancho Penasquitos)

Re: Official EV Project / Ecotality / free charger thread

Mon Nov 09, 2015 10:59 am

Opened the front panel on the EVSE. Does not seem too complicated to change out the charge cable. I hope the new cable arrives by Wednesday as I am off from work that (Veteran's day).

Image
#1 Blue SL-ETEC
Delivered: Earth Day 2011 - April 22 -upgraded to LEAF#2 after two years
#2- 2013 Dark grey- SL - April 2013 - Leased

QueenBee
Posts: 1564
Joined: Sun Aug 08, 2010 5:14 pm
Delivery Date: 20 Jun 2011
Leaf Number: 2062
Location: Bellevue (Seattle), WA

Re: Official EV Project / Ecotality / free charger thread

Mon Nov 09, 2015 11:38 am

Nope, shouldn't be too hard. The only out of the ordinary things are you want the ground wire to be the longest and the pilot wire shortest, and as you can see they put a "break away" female/male connector there. These things are done so that if for some reason the car rolled away while charging, or for some other reason the wire got pulled on the pilot would break first shutting the relays off and then ground stays connected the longest.

pksd1
Posts: 247
Joined: Mon May 03, 2010 6:47 pm
Delivery Date: 22 Apr 2011
Leaf Number: 565
Location: San Diego (Rancho Penasquitos)

Re: Official EV Project / Ecotality / free charger thread

Mon Nov 09, 2015 11:47 am

QueenBee wrote:Nope, shouldn't be too hard. The only out of the ordinary things are you want the ground wire to be the longest and the pilot wire shortest, and as you can see they put a "break away" female/male connector there. These things are done so that if for some reason the car rolled away while charging, or for some other reason the wire got pulled on the pilot would break first shutting the relays off and then ground stays connected the longest.



That's good to know. I do have an inclined driveway :)
#1 Blue SL-ETEC
Delivered: Earth Day 2011 - April 22 -upgraded to LEAF#2 after two years
#2- 2013 Dark grey- SL - April 2013 - Leased

TimLee
Posts: 2810
Joined: Thu Jan 20, 2011 9:40 am
Delivery Date: 17 May 2011
Leaf Number: 2026
Location: Chattanooga, TN

Re: Official EV Project / Ecotality / free charger thread

Mon Nov 09, 2015 12:32 pm

pksd1 wrote:... That's good to know. I do have an inclined driveway :)

Always put in Park and set the emergency brake.
There is an old thread where someone apparently did not do that and inadvertantly left the LEAF running in Ready mode.
LEAF did not move because Creep was offsetting slope of driveway.
When LEAF high voltage pack disconnect happened the LEAF rolled down the sloped driveway and took out a fence.
Fortunately no people were hurt.
But that error could result in fatalities.

Tim Lee
Chattanooga, TN

Man. Date: 03/10/11, VIN # 2026
Delivered 05-17-2011
Blue Ocean, 2011 SL-eTec

Valdemar
Posts: 2407
Joined: Tue May 10, 2011 10:32 pm
Delivery Date: 09 Sep 2011
Location: Oak Park, CA

Re: Official EV Project / Ecotality / free charger thread

Mon Nov 09, 2015 12:45 pm

pksd1 wrote:Opened the front panel on the EVSE. Does not seem too complicated to change out the charge cable. I hope the new cable arrives by Wednesday as I am off from work that (Veteran's day).

Image


Are 3 and 4 just regular set screws holding down stranded wire or there are any sort of crimps?
'11 SL, totaled
-1CB@33k/21mo, -2CB@53k/33mo, -3CB@68k/41mo, -4CB(41.5AHr)@79k/49mo, -5CB(38.85AHr)@87.5k/54mo
-0CB(66.14AHr)@87.5k/54mo (BBB)
59.7AHr, SOH 93%, 118k miles
9kW Solar

Return to “EVSE / Charging Equipment and Networks”