edatoakrun
Posts: 4235
Joined: Thu Nov 11, 2010 9:33 am
Delivery Date: 15 May 2011
Leaf Number: 2184
Location: Shasta County, North California

The Netherlands nationwide network of fast-charging stations

Thu Jul 11, 2013 7:22 am

Go to the link for the map and video.

ABB to build biggest nationwide network of fast chargers

The Netherlands is to become the most populous country yet to roll out a nationwide network of fast-charging stations, thanks to a deal between ABB and Fastned- the country’s leading charging infrastructure developer.

ABB will supply more than 200 electric vehicle fast charging stations, bringing a ‘refuelling’ point within 50 km (31 miles) of all the country’s 16.7 million inhabitants. Each of the stations will be situated along a highway and will be equipped with several multi-standards fast chargers, such as the 50 kilowatt (kW) Terra 52 and Terra 53 models, capable of charging electric vehicles in 15-30 minutes. The first ABB Terra fast chargers are due to be delivered in September 2013, while construction of all the Fastned stations, complete with solar canopies, is expected to be finished by 2015.

Open network

Swiss power and automation technologies firm, ABB, has designed its charging stations to a multi-standard design, capable of serving EVs offered by all major car brands from Europe, Asia and the USA. Featuring open standards-based cloud connectivity, Fastned’s new chargers will be able to offer user-friendly payment and access service for all drivers.

Each web-connected ABB fast charger has a wide range of connectivity features, including remote assistance, management and servicing and smart software upgrades. ABB’s multi-standard design supports all fast-charging standards and protocols such as CCS and CHAdeMO.

“This countrywide network of locations will lay the basis for the commercially viable development of e-mobility,” said Bart Lubbers, one of Fastned’s founders. “I foresee a race towards faster charging and larger batteries throughout the car industry.”...


http://www.thegreencarwebsite.co.uk/blo ... -chargers/
no condition is permanent

addseo2015
Posts: 4
Joined: Tue May 19, 2015 8:19 pm
Delivery Date: 20 May 1986

Re: The Netherlands nationwide network of fast-charging stations

Sun Jul 26, 2015 12:48 am

leading charging infrastructure developer.

User avatar
DNAinaGoodWay
Gold Member
Posts: 2596
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: The Netherlands nationwide network of fast-charging stations

Sun Jul 26, 2015 6:13 am

It's an old OP, but it says it would be finished by 2015. Is it?

The Netherlands is about the same size as southern New England. Would like to have a similar network here.
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new

@ 25 months, 25k, 267 GID, 56.88 Ahr
@ 29 months, 29k, 286 GID, 60.88 Ahr
@ 31 months, 30.3k, 274 GID, 58.39 Ahr

6.72 kW Array

Return to “Europe”