Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Fri Jul 22, 2016 2:27 pm

Yeah, I'm mystified about the next Leaf. I believe the only things I've seen about it are rumors, and I don't have the patience to wade through the thread(s) about it. With such a worldwide base, perhaps Nissan does not feel they have to compete with a 200-mi Bolt.
Theo
2014 SV, QC+LED, Gun Metallic

User avatar
DNAinaGoodWay
Posts: 2738
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Fri Jul 22, 2016 3:31 pm

Oh, they will. My guess is they'll roll out a 300 mile Leaf just as the Bolt comes out. Blow us all away.
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

tmatthias
Posts: 34
Joined: Mon Aug 18, 2014 4:03 pm
Delivery Date: 18 Aug 2014
Leaf Number: 331854
Location: Western MA

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Fri Jul 22, 2016 6:06 pm

Fingers crossed!
Theo
2014 SV, QC+LED, Gun Metallic

User avatar
DNAinaGoodWay
Posts: 2738
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Tue Oct 11, 2016 1:28 pm

Made a trip to Boston today, so stopped at Natick, Framingham, and Westboro plazas and no sign of any work being done. There is work on a stand alone Starbucks at Framingham, just as you pull in, but none of the construction guys knew anything about a charge station there. Sigh :|
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

tmatthias
Posts: 34
Joined: Mon Aug 18, 2014 4:03 pm
Delivery Date: 18 Aug 2014
Leaf Number: 331854
Location: Western MA

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Tue Oct 11, 2016 1:55 pm

DNAinaGoodWay wrote:Made a trip to Boston today, so stopped at Natick, Framingham, and Westboro plazas and no sign of any work being done. There is work on a stand alone Starbucks at Framingham, just as you pull in, but none of the construction guys knew anything about a charge station there. Sigh :|


Yup! And I can confirm that none of the plazas between Exit 4 and Exit 13 show any signs of charger installation activity. Anything out west of Exit 4?
Theo
2014 SV, QC+LED, Gun Metallic

User avatar
DNAinaGoodWay
Posts: 2738
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Sun Oct 30, 2016 5:32 am

While I still see no sign of installation, I've found a little more information.

From: http://pluginsites.org/ev-fast-charging ... -turnpike/

The 50kW DC Fast Chargers will support both CHAdeMO and SAE Combo connectors and are being installed by contractor, Voltrek, LLC of Andover, MA. The initial locations are planned for Framingham westbound, Natick eastbound, Charlton eastbound and westbound, Blandford westbound and Lee eastbound.


Also says free for the first six months and planned for expansion.
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

User avatar
DNAinaGoodWay
Posts: 2738
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Mon Oct 31, 2016 1:25 pm

Inquired of the DOT, and got this in return:

In responding to your inquiry:

The final plans for Framingham and Natick were completed earlier this month and were followed by site visits to mark station and electrical infrastructure for dig-safe purposes.
Acquiring the equipment has taken a little longer than first anticipated because we are working on details that could see some equipment and services provided to MassDOT that will offset our construction and installation costs.
We are still hopeful we can have Framingham and Natick installed and operational in November. The two Lee stations are still on track for installation and activation this construction season. The Charlton sites may have to wait until next construction season as we await resources from National Grid.

Donald Pettey
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

User avatar
DNAinaGoodWay
Posts: 2738
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Wed Nov 16, 2016 5:12 pm

Out around Boston again today. Still no installations, just the dig safe markings. Both Natick and Framingham stations will be just after the main buildings.

IMG_6010.JPG

IMG_6009.JPG
You do not have the required permissions to view the files attached to this post.
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

User avatar
DNAinaGoodWay
Posts: 2738
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Tue Dec 13, 2016 9:56 am

Got an update today, another month at least:

I wanted to provide an update on our Natick & Framingham sites.

We should be starting site work this week with station delivery and installation in the first or second week of January.

The Department of Energy Resources is interested in partnering with us to have some kind of announcement/event. We’ll know more when we tighten our installation schedule.

Donald
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

User avatar
DNAinaGoodWay
Posts: 2738
Joined: Mon Dec 17, 2012 1:43 am
Delivery Date: 03 Dec 2012
Leaf Number: 23156
Location: Central Massachusetts

Re: MA Clean Vehicle Project - $50k QC Deployment Awards

Tue Dec 13, 2016 12:54 pm

Inquired about the markings and got this back:

You are very close, the “P” stands for Present. The F does indicate Future station locations. We are sizing the electrical service for at least three stations and we are running conduit under the sidewalk for those future stations.

The stations will be located at the edge of the curb line with bollards in the pavement to protect against damage. We hope this configuration does not significantly increase snow clearing responsibilities.

Donald
'12 SL last reading @ 2 yr, 22k, 260 GIDs, 62.35 Ahr

'15 SV w/QC, Mfd 5/14, Leased 8/14, 292 GIDs, 64.38 Ahr when new
@ 36 months, 34k, 270 GID, 57.49 Ahr

'17 Bolt LT



6.72 kW Array

Return to “Eastern USA”