Sat Aug 12, 2017 4:01 pm

abasile wrote:<snip>
Tuolumne Meadows, on the other hand, is comparatively isolated and much less congested. Other than Tesla Superchargers, US-395 is an EV charging desert, and there appear to be no plans to change that in the near future. I agree that CCS/CHAdeMO QCs in Lee Vining could be quite helpful, even for Tesla owners. Still, there's a lot of elevation change between Tuolumne and Lee Vining, so it's not exactly ideal to have to drive down to Lee Vining if you're in Tuolumne and you need to add more charge (unless of course you're going to Mono Lake for the evening anyway). People in gas cars now have to do this, but at least they generally have more range per "fill up". Also, compared to using a QC, it's more convenient and easier on the grid to charge on L2 while one sleeps, and it's always ideal if one can start the drive home with close to a full charge.

So, in view of Tuolumne's isolation and the large number of campsites there, I'd strongly encourage you to submit any EV charging proposal that includes L2 in Tuolumne Meadows. :D Even for through-travelers on CA-120, having some EVSEs in Tuolumne would provide range assurance on that long stretch of road.

I'm leaning your way for Tuolumne (and Badger Pass) at least, for reasons we both agree on, although I think we could skip Wawona and maybe the Valley (especially if they put a QC in El Portal), although we really should have L2 down there at the lodgings/campgrounds. But, if there are QCs at both Rush Creek and Lee Vining, they're only 68.5 miles apart and that's easily doable round trip in either direction, eliminating most if not all the anxiety.

Another option, which I discussed with the owner a few years back, would be a few L2(s) at Tioga Pass Resort by Tioga Lake, as they have a cafe' there that gets a lot of visitors, as well as their overnight guests. At the time I think they were changing owners so they were non-committal, and in any case there were no external outlets at all, but now that there are more BEVs that can get there I'll give it another shot and see if they're interested. Even with those, some L2s in Tuolumne would be useful, and it is a destination itself, unlike Lee Vining (barring the Deli; I've made that round trip quite a few times just for dinner), which is mainly a way station to other points.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

User avatar
paulgipe
Gold Member
Posts: 190
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Expanding EV charging in Yosemite

Sat Aug 19, 2017 2:30 pm

abasile, gra, keep up the work on this. We just spent a week at Toulumne Lodge and drove our Volt. Yes, I've seen a Volt charge on the 120 outlet near the shuttle stop but it isn't ideal. I don't recommend it as it looks like someone's parking in a no parking area. I didn't avail myself of it for that reason. The Volt has an engine so it's disruptive to charge that way when it's not needed.

The idea of some L2s there and in the campground or at the old gas station is sound and overdue. We bought the Volt in part because we can't get the Leaf up the East Side to Toulumne. Tesla, no problem. There's are chargers all the way up. CCS/CHAdeMO, not a one and as far as I can tell there are no plans for any!

There are the two NEMA 14-50s in Independence. We always stay at the Independence Inn and that gives us 35 miles either way as an EV.

Even with a Bolt we'd barely make Independence from Bakersfield on one charge--and that's no place to run out of juice.

Do either of you have an contacts at the CEC, Volkswagen, or EVgo? We need some DCFC on the East Side--at least something around Ridgecrest/Mojave.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned 11/10/17
2013 Chevy Volt Premium, bought used 10/3/16
L2; ClipperCreek HCS-40; EVSEUpgrade; Jesla; JDapter Stub