Stoaty
Well-known member
I ran across this interesting 20 minute video showing the re-opening of the spillway at Oroville dam. They got the flow rate up to 50,000 cubic feet per second (1/3 of the original design specification):
https://www.youtube.com/watch?v=kQe0J5NLLT4
https://www.youtube.com/watch?v=kQe0J5NLLT4