Construction of two South Carolina Reactors abandoned

My Nissan Leaf Forum

Help Support My Nissan Leaf Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

GRA

Well-known member
Joined
Sep 19, 2011
Messages
14,018
Location
East side of San Francisco Bay
Via NYT:
U.S. Nuclear Comeback Stalls as Two Reactors Are Abandoned
https://www.nytimes.com/2017/07/31/climate/nuclear-power-project-canceled-in-south-carolina.html

These are Westinghouse Gen 3+ AP1000s, which have also been having trouble with design issues/construction cost overruns elsewhere. This may well do it for a nuclear comeback in the U.S. even if Vogtle 3 & 4 complete, given that Westinghouse's bankruptcy filing in March will likely have the same effects in Georgia as it did in South Carolina, unless SMR, fast burn or other advanced (Gen 4) reactors arrive a hell of a lot sooner than forecast. The article also says:

South Carolina currently gets 55 percent of its electricity from nuclear power and 40 percent from coal and natural gas. The two reactors were expected to push most of the state’s remaining coal plants off the grid, reducing planet-warming emissions. But the failure of the project could lead to those coal units running for longer.
 
Back
Top