I won't belabor the Chademo/CCS discussion any longer on this thread. Just making the point that more vehicles of both adapter types are hitting the road every month in both the US and Europe.

Qiantu (Chinese brand) has announced that they are bringing a Sports car to the US and will be using Chademo for the adapter type. Admittedly likely small volumes to start.
2019 SV Plus Silver
2013 Leaf SV
100 Mile Club Member (Number 87)
Max distance on 13 Leaf: 120 miles
Max distance on 19 Leaf: TBD

GRA
Posts: 10466
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue May 14, 2019 4:04 pm

DougWantsALeaf wrote:I have sent in comments to EA asking for at least 2 Chademo connectors. I am hoping that that heavy Leaf/Mitsubishi usage will push economics to have them offer 2 or 3 connectors.

EA's the wrong entity to send such requests to. They are only putting in 1 CHAdeMO at a site because they were required to, but they have no incentive to expand that. You need to send your comments to the government agencies involved in the settlement, if you want to see any changes.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 10466
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue May 14, 2019 4:18 pm

One site has opened, #18 for the month and #174 total: Columbia, SC (I-26, btwn. Jcts. with I-20 and U.S. 176). This site is reachable from Florence and Walterboro, SC, but also Asheville, NC and Commerce, GA. The latter two are possible, but a bit beyond the practical range.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 10466
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed May 15, 2019 4:12 pm

Tomah, WI (Jct. I-94/U.S. 12, a bit north of the I-90/94 Jct.) is open, #19 for the month and #175 total.

Tomah makes travel between Chicago and the Twin Cities possible, albeit not yet practical owing to the 163 mile leg between Rockford and Tomah (it's only 75 miles from Tomah to the Eau Claire QC, then another 98 to Minneapolis). Madison is "Coming soon" and will solve the problem.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 10466
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu May 16, 2019 5:00 pm

Bristol, VA (I-81, nr. U.S. 11/19) is open, #20 for the month and #176 total.

Bristol was much needed, as it shortens the I-81 leg between Knoxville and Wytheville from a possible 191 miles to two practical legs of 126 and 65 miles. Asheville is also practical (94 or 102 miles depending on which interstate route you use), and Williamsburg KY is possible at 158 miles.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 10466
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sat May 18, 2019 3:31 pm

Two sites have opened, making 22 for the month and 178 total: Dwntn. Sacramento, CA (I-5/80 etc.); Mesquite, NV (I-15, just SW of AZ. border).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 10466
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sun May 19, 2019 3:33 pm

Two sites have opened, making 24 for the month, 180 total: Sherwood, OR (SW of Portland, off S.R. 99W, 5 mi. W. of Jct. I-5/205); Madison, WI (nr, Jct. U.S. 51/S.R. 30, w. of Jct. I-90/94/S.R. 30).

As previously noted, Madison makes the Chicago/Twin Cities route via Rockford practical, year-round. Sherwood is an urban QC, but will serve those people coming up I-5 who will turn off I-5 before reaching Vancouver, WA.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

User avatar
ecoobsessive
Forum Supporter
Posts: 112
Joined: Mon Nov 22, 2010 9:49 pm
Delivery Date: 19 May 2011
Leaf Number: 1725
Location: San Antonio

Re: Electrify America Network

Mon May 20, 2019 7:59 pm

San Antonio station opened recently (I didn't see that one listed on this thread - sorry if I missed it)- 1 CHAdeMO and plenty of CCS. This is the first public DC quick charge in our city. My 2011 LEAF got its first DC charge yesterday after waiting 8 years!
Martha
Red SL + QC (Finally got first QC on 5/19/19)
solarpowered by 5.52 kW PV with unreliable Enphase microinverters

Astros
Posts: 91
Joined: Wed Oct 11, 2017 11:21 am
Delivery Date: 28 Apr 2018
Leaf Number: 310136
Location: Seattle, WA

Re: Electrify America Network

Mon May 20, 2019 8:47 pm

GRA wrote:Two sites have opened, making 24 for the month, 180 total: Sherwood, OR (SW of Portland, off S.R. 99W, 5 mi. W. of Jct. I-5/205); Madison, WI (nr, Jct. U.S. 51/S.R. 30, w. of Jct. I-90/94/S.R. 30).


That Sherwood charger is one I have been watching, and is possibly the only EA charger I am likely to use very much. It's at a good distance from Seattle to the Oregon coast for a dinner break, and there are some restaurants nearby that my kids like.
2019 Deep Blue SL Plus

User avatar
paulgipe
Posts: 272
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Electrify America Network

Tue May 21, 2019 1:13 pm

Guy,

Two sites under construction on US 395 on the East Side of the Sierra Nevada. Put up on Plugshare by Geo: Coso Junction and Bishop.

https://www.plugshare.com/location/190894
https://www.plugshare.com/location/186193

The site in Bakersfield will be delayed for several weeks if not more.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

Return to “EVSE / Charging Equipment and Networks”