Thu Jun 03, 2010 11:26 am
I am in LA City, specifically Leimert Park and have reserved a blue SL though I would prefer green. I am interested in continued postings here by those in LA City. I have already started dealing with the DWP in preparation for getting the EVSE installed in our single family home (outside garage wall probably, no room in garage for cars). DWP and LA Building and Safety are sure not ready for this yet. Their information is non-existent at this point. I have gotten DWP to come to the house to make the drawing of where the TOU (time of use) meter would be installed by the electrical contractor. Application on DWP site for separate EV related meter is out of date and requires VIN number of vehicle and purchase date. I have told them verbally this won't work since I need to get the installation done prior to purchasing the car so that I can start charging it right away. Anyhow, I am interested in anyone else's experiences thus far.
Delivered: May 3, 2011
VIN: 1467 made 3-7-11
SL, Blue, eTec trim, EV project Blink
[purchased] as of 11-1-13: 25,000: 11 bars
Also have a PiP