GRA
Posts: 12403
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Feb 06, 2020 4:34 pm

One site is open, #1 for the month and #399 total: Tracy, CA (I-205 ex. 6).

This site is mainly useful for people driving between the S.F. Bay Area and points east (Yosemite etc.), although it's too close to the Bay Area to be much use outbound. It will also serve as a somewhat off-route backup for Patterson and later Stockton, for people driving I-5 N-S.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 12403
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Feb 06, 2020 4:36 pm

GetOffYourGas wrote:
Thu Feb 06, 2020 10:01 am
GRA wrote:
Wed Feb 05, 2020 7:45 pm
Electrify America is gaining ground on Tersla Supercharging
https://www.greencarreports.com/news/11 ... ercharging
Ermahgerd! Tersla! Werch ort!
;) My typo, fixed.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 12403
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Fri Feb 07, 2020 4:55 pm

One site is open, #2 for the month and #400 total (as expected): Union City, CA. (Urb., I-880 ex. 24).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

johnlocke
Posts: 629
Joined: Fri Jan 08, 2016 3:47 pm
Delivery Date: 14 Dec 2015
Leaf Number: 300582

Re: Electrify America Network

Wed Feb 12, 2020 10:38 pm

The Murphy Canyon Walmart in San Diego finally has the EA Chademo connector hooked up. It's going to be awkward for a Leaf to use since the charging station is positioned half way down the the parking space on the passenger side and the cables are short. It's a CCS/Chademo combo station. I'm not sure who they expect to use it.
2016 SV, New battery at 45K mi.
Jamul, CA
San Diego East County

User avatar
paulgipe
Posts: 370
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Electrify America Network

Thu Feb 13, 2020 12:15 pm

johnlocke wrote:
Wed Feb 12, 2020 10:38 pm
The Murphy Canyon Walmart in San Diego finally has the EA Chademo connector hooked up. It's going to be awkward for a Leaf to use since the charging station is positioned half way down the the parking space on the passenger side and the cables are short. It's a CCS/Chademo combo station. I'm not sure who they expect to use it.
They don't expect anyone to use it and CARB doesn't care. Official policy is that CHAdeMO is not being built today. Yes, I know, don't shoot me, that's what they told me.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
http://www.wind-works.org

WetEV
Posts: 4064
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Thu Feb 13, 2020 3:58 pm

660 Stanford Shopping Center
Palo Alto, CA 94304
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

WetEV
Posts: 4064
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Thu Feb 13, 2020 4:14 pm

I do not see this site on EA's pages.

Stable Headquarters (San Francisco, CA) 1999 Bryant Street San Francisco, CA 94110 (Added 1/27/20)
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 12403
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Feb 13, 2020 6:33 pm

As we've recently hit 400 open sites (now 401) and most of the remaining "Coming Soon" sites are urban, from now on I'm inclined to only list those sites that expand coverage or provide a useful boost to density on national or regional routes. I'll still list totals at the end of each month, but continuing to list every site in major metro areas that're only a couple of miles from another strikes me as unnecessary. People who want to use such sites regularly can find them for themselves.

WetEV, EA's "Coming Soon" site totals bounce around a bit - when they were at 400 they showed 77 "Coming Soon" , but at 401 they now show 74, so they must have removed a couple including the one on Bryant St.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 12403
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Fri Feb 14, 2020 5:27 pm

A "Coming Soon" site has been added in Sterling, VA, so the totals now read 401 and 75. I've added it to the list, and show Bryant St. S.F. as removed.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GaleHawkins
Posts: 400
Joined: Sat Oct 26, 2019 5:24 pm
Delivery Date: 15 Oct 2019
Leaf Number: 311365
Location: Murray KY

Re: Electrify America Network

Fri Feb 14, 2020 10:41 pm

johnlocke wrote:
Wed Feb 12, 2020 10:38 pm
The Murphy Canyon Walmart in San Diego finally has the EA Chademo connector hooked up. It's going to be awkward for a Leaf to use since the charging station is positioned half way down the the parking space on the passenger side and the cables are short. It's a CCS/Chademo combo station. I'm not sure who they expect to use it.
Same awkward set up at Walmart in Paducah KY. I just line up so the cable fits best. Due to my physical limitations from arthritis it is a painful but doable connection. Getting the connection made feels like I am bending a large steel rod. It works fine however. Not sure I am going to DC charge the new 40 or not. I used it a few times on the dying 30 kWh battery just so I could get back home.