Re: Electrify America Network

Fri Oct 30, 2020 4:49 am

9200 S Western Ave
Evergreen Park, IL 60805
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 12392
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Fri Oct 30, 2020 11:57 am

WetEV wrote:
Tue Oct 27, 2020 8:52 pm
35 W Napa St
Sonoma, CA 95476

That one's a useful density improvement for inter-regional travel.
Last edited by GRA on Sat Oct 31, 2020 9:41 am, edited 1 time in total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

WetEV
Posts: 4055
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Sat Oct 31, 2020 4:17 am

14003 NE Woodinville Duvall Rd
Woodinville, WA 98072

and

1275 Broadway Plaza
Walnut Creek, CA 94596
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

WetEV
Posts: 4055
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Sat Oct 31, 2020 8:41 pm

1225 W Bakerview Rd
Bellingham, WA 98226

and

9210-9440 North Sheridan Blvd
Westminster, CO 80031
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 12392
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sat Oct 31, 2020 9:47 pm

At the end of October there were 491 sites open and 171 "Coming soon". Thanks to the no-notice shutdown over Labor Day weekend* of sites along I-95, and their gradual re-opening, I haven't been tracking how many new sites opened this month. I'm also not going to update WetEV's list anymore, as the number of sites reduces the value of each additional one, especially as many of them are in urban clusters to boost density and capacity. Depending on how things go we'll provably see site #500 open in November.

Bellingham is one of the expanded coverage sites I have been keeping track of as it completes the northern end of I-5, so glad to see it's open.



*I hope the genius who made that decision was awarded appropriately, preferably by being tied to one of the closed chargers and being beaten with otherwise useless CCS and/or CHAdeMO connectors by BEV owners who were stranded that weekend.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 12392
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Nov 05, 2020 8:46 pm

A "Coming soon" site has appeared in Warrenton, OR, on U.S. 101 west of Astoria. This is north of the CS site in Newport, so helps expand coverage.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 12392
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Fri Nov 06, 2020 11:55 pm

Several new "Coming soon" sites I've added to my watch list, all in California: Lost Hills (I-5); Solvang (S.R. 246 E. of U.S. 101); Buck Meadows (Yes! S.R. 120 E. of Groveland).

Lost Hills is infill, as is Solvang. The site in Solvang appears to be well east of downtown so not a great location, but something was needed between Pismo zBeach and Camarillo.

Buck Meadows is the essential site on the NW approach to/through Yosemite. I'd suggested Groveland where Tesla and CEC have sites (the latter's been sitting static for one year, waiting for a transformer), as Groveland has more places to eat. Buck Meadows has this single somewhat seedy-looking lodge with an equally seedy-looking restaurant and gas station, and it's generally passed by, but this should boost business for the restaurant.

It's also 11 miles closer to Yosemite and several hundred feet higher than Groveland, and just 80 miles from Lee Vining, so short of putting it even further east at Rush Creek Lodge where there's already a single CP dual-standard QC, this is about as good a location as you can get. I wonder if we'll be seeing a site appear in Lee Vining soon.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 12392
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Nov 09, 2020 6:27 pm

One more "Coming soon" site that provides an expansion of coverage: Poulsbo, WA on the peninsula north of Bremerton, at the junction of S.R.'s 3/305/307. This is about 13 miles via 305 from the ferry terminal to/from Seattle at Bainbridge Island.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

danrjones
Posts: 785
Joined: Wed Apr 17, 2019 8:02 am
Delivery Date: 17 Jun 2019
Location: Ridgecrest, CA

Re: Electrify America Network

Tue Nov 10, 2020 3:41 pm

I noticed that plugshare has photos up for the new sites along I-40:

Fenner, Needles & Williams AZ. Nothing yet for Kingman AZ.

Those first three look like they are coming along fast.
But then so did my nearest station, Kramer Junction, then it took 2 years to open.
2018 Leaf SV Pearl White with Tech and All Weather, Purchased New on 5/3/19

GRA
Posts: 12392
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue Nov 10, 2020 9:28 pm

EA is now showing 500 stations open, with 158 "Coming soon". The numbers were 497/179 yesterday, so either there's a glitch on the website or they must have abandoned a bunch of the "Coming soon" sites. None of the ones I'm watching have disappeared.

For the record, #400 was opened on Feb. 7th, so they're averaging almost exactly 11/month.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

Return to “EVSE / Charging Equipment and Networks”