Tue Oct 22, 2019 3:32 pm
Saugus, MA (Urb., U.S. 1) is open, #20 for the month and #322 total.
I'll be out of town and probably off-line for the next few days, so I leave it up to WetEV and others to keep track of openings in the interim. I hope to check on the status of a few "Coming Soon" sites in passing, if time permits.
BTW, I notice that EA has now added open (322) and coming soon (138) station counts to their map page, and they also show the number of open CCS (1,116), CCS-CHAdeMO (322), and L2 (51) stations. As L2s are only at urban sites, we can see that currently there should be 271 Hwy QC sites which all should have at least one 350kW charger, not that anyone can use the full capacity yet.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].