DougWantsALeaf
Posts: 992
Joined: Fri May 10, 2013 8:21 pm
Delivery Date: 18 May 2013
Leaf Number: 407811
Location: Chicago North Side

Re: Electrify America Network

Sun Oct 20, 2019 8:31 pm

Thanks, though it seems they left CA for last. Will be excited for the Milwaukee stop to open, and hope to see Green Bay on a phase 2 map.
2019 SV Plus Silver
2013 Leaf SV
100 Mile Club Member (Number 87)
Max distance on 13 Leaf: 120 miles
Max distance on 19 Leaf: 242 Highway 4.5 miles/kWh (4.9 KWh remaining)

WetEV
Posts: 3130
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Mon Oct 21, 2019 1:48 pm

One local, one California...
Right by I5, I405 and Seatac airport.

301 Strander Blvd.
Tukwila, WA 98188


9001 Apollo Way
Downey, CA 90242
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 11032
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Oct 21, 2019 6:44 pm

WetEV's list includes several sites that are already open, as well as "Coming Soon" sites. The open ones I noticed were in the west, e.g. el Paso, Trinidad, Beaver, Cedar City, Casa Grande, Benson, Flagstaff, Winslow, Grants, Gallup, Mesquite.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11032
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Oct 21, 2019 6:59 pm

Three sites are open including the two noted by WetEV, making 19 for the month and 321 total: Tukwila, WA (I-5 ex. 153 or I-405 ex. 1); Downey, CA (Urb., I-105 ex. 16/17 or I-605 ex. 9B); Falls Church, VA (U.S. 50).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

WetEV
Posts: 3130
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Tue Oct 22, 2019 10:19 am

770 Broadway
Saugus, MA 01906
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

WetEV
Posts: 3130
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Tue Oct 22, 2019 10:22 am

GRA wrote:
Mon Oct 21, 2019 6:44 pm
WetEV's list includes several sites that are already open, as well as "Coming Soon" sites. The open ones I noticed were in the west, e.g. el Paso, Trinidad, Beaver, Cedar City, Casa Grande, Benson, Flagstaff, Winslow, Grants, Gallup, Mesquite.
Yes. The source for my list is the sites that I've put on notification. There was a glitch when most of AZ was shown as coming soon, so they got added. I need to check this list a few more times... Sigh.

Is there any value in me trying to maintain such a list?
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

GRA
Posts: 11032
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue Oct 22, 2019 1:17 pm

WetEV wrote:
Tue Oct 22, 2019 10:22 am

Is there any value in me trying to maintain such a list?

That's up to you. They're all shown on EA's map, but if you were to separate them by state, I think that would be useful. BTW, with the opening of Downey, California has 40 open EA QC sites.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11032
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue Oct 22, 2019 3:32 pm

Saugus, MA (Urb., U.S. 1) is open, #20 for the month and #322 total.

I'll be out of town and probably off-line for the next few days, so I leave it up to WetEV and others to keep track of openings in the interim. I hope to check on the status of a few "Coming Soon" sites in passing, if time permits.

BTW, I notice that EA has now added open (322) and coming soon (138) station counts to their map page, and they also show the number of open CCS (1,116), CCS-CHAdeMO (322), and L2 (51) stations. As L2s are only at urban sites, we can see that currently there should be 271 Hwy QC sites which all should have at least one 350kW charger, not that anyone can use the full capacity yet.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

User avatar
paulgipe
Posts: 308
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Electrify America Network

Wed Oct 23, 2019 6:21 am

Bakersfield's Panera Bread site still has two of four kiosks down. Both are 350 kW. One 150 kW CCS is working and one 50 kW CHAdeMO/150 kW CCS kiosk looked like it was in operation.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

WetEV
Posts: 3130
Joined: Fri May 04, 2012 8:25 am
Delivery Date: 16 Feb 2014
Location: Near Seattle, WA

Re: Electrify America Network

Wed Oct 23, 2019 5:04 pm

90-15 Queens Blvd.
Elmhurst, NY 11373
WetEV
#49
Most everything around here is wet during the rainy season. And the rainy season is long.
2012 Leaf SL Red (Totaled)
2014 Leaf SL Red
2019 eTron Blue

Return to “EVSE / Charging Equipment and Networks”