I missed the 60% part.

Full charge at 240v/16A is near 8 hours, and near 20 hours at 120v/12A, but these times MIGHT also include some "equilization" time.
QC might be only 15 minutes!
WHERE are the QC stations!!
Good work, Gary
Based on the analysis I did on the CAN bus and using the official Nissan scantool (Consult III+), I believe DC QC is limited to 30kW. (At least it was with a pack around 55 degrees F internal temperature.)garygid wrote:Sorry, you are correct.
I missed the 60% part.
Full charge at 240v/16A is near 8 hours, and near 20 hours at 120v/12A, but these times MIGHT also include some "equilization" time.
QC might be only 15 minutes!
WHERE are the QC stations!!
Good work, Gary
It would probably work better if you used 1/87% or 115%. For example a charge that would take 8 hours on the normal L2 EVSE would take 8/87% or 8*115% or 9.2 hours.rawhog wrote:Thanks for the feedback guys. So then I can use ~87% of charge times as well I suppose?