
Grid Monitoring = Load Detection & Speed Lowering. How does it work?
A simple example with water kettle fighting for power against my Accelev 2phase->1phase charger.
The kettle is connected to one of the power phases.
Using this function I can charge from 3phase socket 16A breakers with a max speed of 7,2 kW/h without any doubt - charger slows down when needed.
I did same for simple 32A single-phase charger and it works too.
https://www.facebook.com/EVSEChargerAcc ... 342249487/