Page 7 of 9

Re: Non EA or EVGo fast charger thread

Posted: Wed May 20, 2020 12:28 am
by GerryAZ
DougWantsALeaf wrote:
Tue May 19, 2020 7:29 pm
2201 W Bell Rd, Phoenix, AZ 85023, US

Last check in was 5/16/2020
Only check in was 5/16/2020. According to Plugshare, this is a 50 kW combination CCS and CHAdeMO station so it is clear the old charger was replaced. I will look at Plugshare once in a while to see if there are more check ins which would indicate it is actually available and being used.

Re: Non EA or EVGo fast charger thread

Posted: Wed May 20, 2020 4:40 pm
by webeleafowners
Boulder creek rest area now online. On highway 16 to Prince Rupert. Two Chademo and Two CCS as well as a J1772

Heres the thing. These are 25 KW Delta Chademo/CCS chargers. They are installed on isolated routes where there is only single phase power available, usually a single 480 volt line. This is a very remote stertch of highway so that makes sense. I believe there are ow a total of 5 of these loactions in the province and a possible sixth coming. Better than nothing...but bring a sandwich or four a big thermos of coffee. :)

Note;. This image is of the Britton Creek rest area on the Coquihalla highway but showed the charger better.

Image

This is the actual rest area. Bathrooms as well....you know...for the big thermos of coffee.

Image

No card or app needed at this time. I suspect up north like this it may stay that way for some time.

Hey, better than nothing.

Re: Non EA or EVGo fast charger thread

Posted: Wed May 20, 2020 5:34 pm
by DougWantsALeaf
210 E 6th St, North Bend, NE 68649, USA

Single Chademo as part of the Nebraska state program.

Re: Non EA or EVGo fast charger thread

Posted: Fri May 22, 2020 8:47 pm
by DougWantsALeaf
Many of the Nebraska state program sites are now listed. This now leaves only a few hundred mile corridor between Grand Island and Denver as relying solely on EA for a Chicago Denver Leaf Trip.

Re: Non EA or EVGo fast charger thread

Posted: Sat May 23, 2020 9:45 am
by DougWantsALeaf
Single chademo

RT-3 N, Plymouth, MA 02360, United States

Re: Non EA or EVGo fast charger thread

Posted: Tue May 26, 2020 5:24 am
by webeleafowners
In December the contract for Newfoundland coverage was let to a company that will be using ChargePoint equipment.

Contract is for 14 Chademo/CCS and 14 Level 2.

Chargers must be available for delivery by June 29, 2020.

Newfoundland Goverment.

Re: Non EA or EVGo fast charger thread

Posted: Tue May 26, 2020 5:33 am
by GetOffYourGas
Two more site agreements announced in upstate NY, both along the I-81 corridor at Mirabito gas stations.

7073 NY-281, Tully, NY 13159

415 E. Brighton Avenue, Syracuse , NY, 13210

Contracts have been signed, but no ground has been broken yet.

Re: Non EA or EVGo fast charger thread

Posted: Fri May 29, 2020 4:31 pm
by DougWantsALeaf
I am way behind on posting Chademo sites.

Here is another Chademo only site.

202 1st St, Talihina, OK 74571, USA

Re: Non EA or EVGo fast charger thread

Posted: Fri Jun 05, 2020 12:02 pm
by DougWantsALeaf
Another half dozen Chademos showed up in Plugshare this week in Nebraska. these are all under the state program. More coverage is needed in the west of the state, but between Omaha and Grand Island they will have nice redundancy.

Re: Non EA or EVGo fast charger thread

Posted: Sun Jun 07, 2020 8:22 pm
by DougWantsALeaf
Triple Chargepoint Chademo

2102 Veterans Dr, Austin, TX 78703, USA