pgrovetom
Posts: 75
Joined: Wed Jun 23, 2010 12:29 pm

May 2010 San Diego Infrastructure Deployment Guideline

Mon Jun 28, 2010 11:41 pm

See page 59 for a Level 2 EVSE cost of installation estimate

http://www.theevproject.com/downloads/d ... 20V3-1.pdf
12.6KW Solar Photovoltaic System
White ZERO S Motorcycle
Silver Nissan Leaf SL

User avatar
Kataphn
Posts: 753
Joined: Thu Jun 03, 2010 10:57 am
Delivery Date: 13 Jun 2013
Location: Los Angeles, CA

Re: May 2010 San Diego Infrastructure Deployment Guideline

Wed Jun 30, 2010 8:25 am

If you come across a similar document for Los Angeles, would love to see it.
Delivered: May 3, 2011
VIN: 1467 made 3-7-11
SL, Blue, eTec trim, EV project Blink
[purchased] as of 11-1-13: 25,000: 11 bars
Also have a PiP

User avatar
garygid
Gold Member
Posts: 12464
Joined: Wed Apr 21, 2010 8:10 am
Delivery Date: 29 Mar 2011
Leaf Number: 000855
Location: Laguna Hills, Orange Co, CA

Re: May 2010 San Diego Infrastructure Deployment Guideline

Wed Jun 30, 2010 8:48 am

Is the "fused disconnect" (that this document lists in its parts lists) required, or just "suggested"?

If required, by whom?
See SOC/GID-Meter and CAN-Do Info
2010 Prius, now for sale
2011 LEAF, sold in 2015
2018 Tesla Model 3
2014 Tesla S, Model 3 in 2019
PU: SDG&E
Solar PV: 33 x 225W -> 7 kW max AC
To Sell: X-treme 5000Li EV motorcycle

User avatar
EVDRIVER
Moderator
Posts: 6656
Joined: Sat Apr 24, 2010 7:51 am

Re: May 2010 San Diego Infrastructure Deployment Guideline

Wed Jun 30, 2010 12:59 pm

12G wire, seems a bit small.

mitch672
Posts: 1956
Joined: Fri Apr 23, 2010 2:10 pm
Location: Boston, MA

Re: May 2010 San Diego Infrastructure Deployment Guideline

Wed Jun 30, 2010 1:05 pm

EVDRIVER wrote:12G wire, seems a bit small.
That has to be a typo, you can't use a 40A circuit breaker with 12 gauge wire, that should be #8,
General guidlines:

#14 for 15A circuits
#12 for 20A circuits
#10 for 30A circuits
#8 for 40A circuits
2012 Advanced Plug in Prius (sold)
I Support OpenEVSE: http://code.google.com/p/open-evse/" onclick="window.open(this.href);return false;
My Fuelly page: http://www.fuelly.com/driver/mitch672/prius-plugin" onclick="window.open(this.href);return false;
Tesla Model S 85KW Dolphin Grey VIN: 03245, delivered 1/17/2013

User avatar
garygid
Gold Member
Posts: 12464
Joined: Wed Apr 21, 2010 8:10 am
Delivery Date: 29 Mar 2011
Leaf Number: 000855
Location: Laguna Hills, Orange Co, CA

Re: May 2010 San Diego Infrastructure Deployment Guideline

Wed Jun 30, 2010 1:33 pm

I agree, #12 is wrong.
See SOC/GID-Meter and CAN-Do Info
2010 Prius, now for sale
2011 LEAF, sold in 2015
2018 Tesla Model 3
2014 Tesla S, Model 3 in 2019
PU: SDG&E
Solar PV: 33 x 225W -> 7 kW max AC
To Sell: X-treme 5000Li EV motorcycle

User avatar
LEAFer
Posts: 2647
Joined: Mon May 24, 2010 10:10 am
Delivery Date: 19 Jan 2011
Leaf Number: 000215
Location: Sacramento Area

Re: May 2010 San Diego Infrastructure Deployment Guideline

Wed Jun 30, 2010 1:38 pm

I emailed eTec about this. I'll post any reply-info I get.
2011 Silver SL+QC [Mfg: 11/2010] 36mo/15k LEASE
06Jun2013 Status [28.5 months][34,173 miles][11 bars]
Lost CapacityBar 6/6/13 @34,173 miles while in LEAF Battery Monitor: 83.41%, 71.4F (avg); cool overnight;

Return to “Batteries & Charging”