GRA
Posts: 11211
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Tue Apr 09, 2019 3:23 pm

Westminster, CO (I-25 N. of Denver, S. of E-470) is open, #4 for the month and #139 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11211
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Apr 10, 2019 4:13 pm

Two sites have opened, making 6 for the month and 141 total: (S.) Sacramento, CA (S.R.99); Englewood, CO (Jct. I-25/S.R. 88, S. of Denver). S. Sacramento is presumably to boost capacity, as it's quite close to the existing site in Elk Grove. Englewood is the southern counterpart to Westminster on I-25.

EA has updated their 'Coming Soon' map, and now shows 198 sites in that category. These must include a lot of the Phase 2 sites. Definitely worth a look if you haven't checked for a while, and you want to see if 'your' route(s) will be covered.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11211
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Apr 11, 2019 5:29 pm

Two sites have opened, making 8 for the month and 143 total: Boise, ID (Jct. I-84/184); Rogers, AR (I-49 N. of Fayetteville).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11211
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sat Apr 13, 2019 4:01 pm

Another site has opened, #9 for the month and #144 total: Southwest Ranches, FL (Jct. I-75/SR 822, W. of Hollywood).
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GetOffYourGas
Posts: 2052
Joined: Tue Dec 20, 2011 6:56 pm
Delivery Date: 09 Mar 2012
Location: Syracuse, NY

Re: Electrify America Network

Sun Apr 14, 2019 8:22 am

GRA wrote:EA has updated their 'Coming Soon' map, and now shows 198 sites in that category. These must include a lot of the Phase 2 sites. Definitely worth a look if you haven't checked for a while, and you want to see if 'your' route(s) will be covered.
Why do you say that? Cycle 1 is supposed to include 484 sites in all. It sounds to me like there are still some missing from their map.
~Brian

EV Fleet:
2011 Torqeedo Travel 1003 electric outboard on a 22' sailboat
2012 Leaf SV (traded for Bolt)
2015 C-Max Energi (302A package)
2017 Bolt Premier

GRA
Posts: 11211
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sun Apr 14, 2019 4:23 pm

GetOffYourGas wrote:
GRA wrote:EA has updated their 'Coming Soon' map, and now shows 198 sites in that category. These must include a lot of the Phase 2 sites. Definitely worth a look if you haven't checked for a while, and you want to see if 'your' route(s) will be covered.
Why do you say that? Cycle 1 is supposed to include 484 sites in all. It sounds to me like there are still some missing from their map.
There are 300 high-power QC sites in Cycle 1, not 484, and the map has always just shown those. At the time I wrote the above there were 141 open HP QC sites + 198 more 'Coming Soon' = 339 total, so assuming they continue to only show the high-power sites on the 'Coming soon' map, there must be 39 from Cycle 2. The locations of most of the new ones, well away from major metro areas but needed for road trips, seems to confirm that. Of course, they could change their approach now.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

User avatar
paulgipe
Posts: 312
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Electrify America Network

Mon Apr 15, 2019 12:54 pm

Guy,

The EA site at Panera Bread in Bakerfield has the kiosks in but is a long way from finished. The transformer is not in and the trenching is still open. 4 kiosks.

Paul
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

GRA
Posts: 11211
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Apr 15, 2019 3:58 pm

paulgipe wrote:Guy,

The EA site at Panera Bread in Bakerfield has the kiosks in but is a long way from finished. The transformer is not in and the trenching is still open. 4 kiosks.

Paul
Thanks. Given how long ago you reported work at Madera, which still hasn't opened, I suspect permit issues are holding up that and many other CA sites.

A site in Buckeye, AZ (I-10 E. of S.R. 85) has opened, #10 for the month and #145 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11211
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Apr 17, 2019 5:19 pm

Trinidad, CO (I-25, S. of Jct. U.S. 160/S.R. 12) is open, #11 for the month and #146 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

DougWantsALeaf
Posts: 1069
Joined: Fri May 10, 2013 8:21 pm
Delivery Date: 18 May 2013
Leaf Number: 407811
Location: Chicago North Side

Re: Electrify America Network

Wed Apr 17, 2019 5:22 pm

Thank you for keeping up with the openings.
2019 SV Plus Silver
2013 Leaf SV
100 Mile Club Member (Number 87)
Max distance on 13 Leaf: 120 miles
Max distance on 19 Leaf: 242 Highway 4.5 miles/kWh (4.9 KWh remaining)