coulomb
Posts: 71
Joined: Thu Oct 09, 2014 5:08 pm
Delivery Date: 07 Mar 2015
Leaf Number: 200445
Location: Brisbane, Australia

Re: Electrify America Network

Sat Sep 14, 2019 8:23 pm

wmcbrine wrote:
Sat Sep 14, 2019 6:37 pm
It's an interesting question why public charging stations break down so often...
I agree. I find that often they just need a reset, though that sometimes has to come from the network operator (i.e. I call the help line, ask them to reset it, and lo and behold it behaves again). That sounds like imperfect software testing to me.

But also they are often out in the weather, often with members of the public walking past them. The temptation to fiddle with them must be overwhelming for some, and as you say, to vandalise them for (hopefully) a few. I wonder what the average MAGA-hat wearing redneck thinks of these new fangled things that seem to be used by mostly well-to-do elite types.

In Australia, the emergency stop buttons (if even present) are well recessed, and some are even behind glass. They might be like a magnet for "tough kids" showing off.
2012 Leaf with new battery May 2019. New to me June 2019.

DaveinOlyWA
Posts: 14231
Joined: Sat Apr 24, 2010 7:43 pm
Delivery Date: 16 Nov 2019
Leaf Number: 319862
Location: Olympia, WA
Contact: Website

Re: Electrify America Network

Sat Sep 14, 2019 8:29 pm

I think some of the break downs is vandalism. Yakima EA is having major issues. There appears to be a concerted effort to prevent anyone from charging there.
2011 SL; 44,598 mi, 87% SOH. 2013 S; 44,840 mi, 91% SOH. 2016 S30; 29,413 mi, 99% SOH. 2018 S; 25,185 mi, SOH 92.23%. 2019 S Plus; 412 mi, 99.72% SOH
My Blog; http://daveinolywa.blogspot.com" onclick="window.open(this.href);return false;

User avatar
paulgipe
Posts: 312
Joined: Sat Aug 02, 2014 4:23 pm
Delivery Date: 20 Oct 2014
Leaf Number: 311200
Location: Bakersfield, CA 93305
Contact: Website

Re: Electrify America Network:

Sun Sep 15, 2019 4:33 pm

Transformer Installed at EA's Bakersfield Station

Sometime in the past week PG&E has installed the transformer for the Electrify America station in Bakersfield, California.

Image

The four-kiosk station has stood nearly complete--less the transformer--for months at Panera Bread.

The station remains offline and the protective plastic wrap, what remains of it, is still on the equipment and cables.

EA's transformer finally installed by PG&E at Panera Bread in Bakersfield, CA.

EA's bakersfield station's four kiosks can serve vehicles with CCS connectors for fast charging. One of the kiosks serves a dual role, charging either CCS cars or those using the CHAdeMO standard, such as the Nissan Leaf.

Ollie Danner, a local EV entrepreneur, said at this Saturday's Drive Electric event in Bakersfield that he'd followed a PG&E truck with the transformer into town to the Panera Bread site.

Drivers using the CHAdeMO DCFC standard should note that the CHAdeMO kiosk also has a CCS cable. If a CCS capable car is charging at the kiosk, the CHAdeMO cable won't be enabled and you'll have to wait until the other vehicle finishes charging.

Image

Dual head kiosk with CCS and CHAdeMO cables at the EA station in Bakersfield, CA.
Bakersfield, California
2017 Bolt LT with DCFC, leased 11/09/17
2015 Nissan S with QC, leased, returned
2013 Chevy Volt Premium, used 10/3/16, sold
L2; ClipperCreek HCS-40; Jesla; JDapter Stub
http://www.wind-works.org

GRA
Posts: 11205
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Sep 18, 2019 4:05 pm

Two sites have opened, making 7 for the month and 292 total: Pecos, TX (Jct. I-20 ex. 42/U.S. 285); Ypsilanti, MI (Jct. I-94 ex. 181/A/B & U.S. 12).


Pecos closes the last major gap on I-20 west of DFW, shortening the 183 mile leg between Midland and Van Horn to two legs of 94 and 88 miles.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11205
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Thu Sep 19, 2019 3:47 pm

Novi MI (I-96 ex. 162, W. of Jct. I-275/696) is open, #8 for the month and #293 total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GRA
Posts: 11205
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Sat Sep 21, 2019 1:24 pm

Ft. Lauderdale, FL (Jct. I-95 ex. 26/27 & S.R. 842) is open, #9 for the month and #294 total. Davie and SW Ranches are in the same general area, but this is right off I-95. Open on 9/13, but I missed it for a while after EA switched over to the new map, which makes me scan through the entire list to I.D. any new sites.
Last edited by GRA on Sun Sep 22, 2019 4:05 pm, edited 1 time in total.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

DougWantsALeaf
Posts: 1064
Joined: Fri May 10, 2013 8:21 pm
Delivery Date: 18 May 2013
Leaf Number: 407811
Location: Chicago North Side

Re: Electrify America Network

Sun Sep 22, 2019 2:38 pm

EA Iowa Chademos are both back up. The fix rate seems to be improving. It’s a good sign.
2019 SV Plus Silver
2013 Leaf SV
100 Mile Club Member (Number 87)
Max distance on 13 Leaf: 120 miles
Max distance on 19 Leaf: 242 Highway 4.5 miles/kWh (4.9 KWh remaining)

GRA
Posts: 11205
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Mon Sep 23, 2019 5:24 pm

Fresno, CA #2 (S.R. 41 ex. 134) is open as of 9/19, #10 for the month, #295 total (and #30 for California).

This is just off the main route into Yosemite from the south, so it should see a fair amount of use.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

GetOffYourGas
Posts: 2052
Joined: Tue Dec 20, 2011 6:56 pm
Delivery Date: 09 Mar 2012
Location: Syracuse, NY

Re: Electrify America Network

Wed Sep 25, 2019 1:39 pm

Newburgh, NY is open (woot!). This is at a critical intersection of I-87 and I-84. It will serve travelers in both N/S and E/W directions. It is a little redundant with Greenlots chargers for I-87 travelers, but EA so far has a much better track record for availability and maintenance than Greenlots.
~Brian

EV Fleet:
2011 Torqeedo Travel 1003 electric outboard on a 22' sailboat
2012 Leaf SV (traded for Bolt)
2015 C-Max Energi (302A package)
2017 Bolt Premier

GRA
Posts: 11205
Joined: Mon Sep 19, 2011 1:49 pm
Location: East side of San Francisco Bay

Re: Electrify America Network

Wed Sep 25, 2019 5:36 pm

^^^ Glad you caught that, because I missed it in my daily skimming of the list as my brain started to glaze over. Newburgh is #11 for the month, #296 total. This one's definitely in a needed location.
Guy [I have lots of experience designing/selling off-grid AE systems, some using EVs but don't own one. Local trips are by foot, bike and/or rapid transit].

The 'best' is the enemy of 'good enough'. Copper shot, not Silver bullets.

Return to “EVSE / Charging Equipment and Networks”