I checked out as much as I can in my area this morning. At coso junction both the EA site and the Caltrans site look the same as the last time. EA is likely waiting on SCE and the Caltrans site is waiting for the charger to be installed. Who is installing the charger was never clear to me, whether Caltrans or Genuine Engineering or someone else.
Nothing at Bradys. And at Inyokern nothing changed this last week. Probably also waiting on SCE.
So we have two sites that are probably ready and waiting on SCE. Whether EAs Coso site will be first I can only guess. Added a photo of Coso Caltrans site to plugshare and one at Inyokern.