Mon Sep 30, 2019 5:52 pm
In addition to the two sites, both urban, that WetEV mentions above, two more sites are also open, making 17 for the month and 302 total: Woodbury, MA (Jct. I-94 ex. 251/CTY. Rt. 19); Clarion, PA (Jct. I-80 ex. 62/S.R. 68).
Woodbury was the only site planned for MN, which along with the recently opened site in Rhode Island makes 40 states with EA QCs, with only two more states to be added, NH (Seabrook) and ME (Scarborough). Those states not scheduled for sites are AK, HI, WY, ND, SD, AL, WV, VT .