I had installed a 2.5kw pv system in July 2011. I have a e-6 net metering system. I get charged $11-$13 per month for non electric use. PGE is charging me for distribution, public purpose programs and generation and sometimes nuclear decommissioning.
I was not aware of these charges when my system was installed. I feel I should not be charged these fees because I supply peak time power to PGE.
Can anyone shed some light on these charges?
Thanks
John
2011 silver Leaf sle
I was not aware of these charges when my system was installed. I feel I should not be charged these fees because I supply peak time power to PGE.
Can anyone shed some light on these charges?
Thanks
John
2011 silver Leaf sle