Well no thanks to the LADWP and Dept of Bldg and Safety for endless dragging and so on... our new expanded 10kw SolarWorld mono 265's with full Enphase is being installed in these 3 days... (was set for Aug :lol: )
Basically.. and EVERYONE has asked "why a 10kw??" welp.. because there's a 85kw Model S in the near future.. and LADWP would not allow us to over size the system without the paperwork of the 2nd EV..
So let's begin...
The best of the best.. SolarWorld 265 Mono's... This is the first stack and I help unload them (well.. they are mine.. paid in FULL!) Fresh from Oregon!
Boxes and boxes of Enphase's...
Main 250a rear with my TOU meter now pushing 100a to garage and side... (HPC)..
Initial racking to start with new PV Quick Mounts (USA Cali made).. Inverters are now installed.. but it's dark out..
http://www.quickmountpv.com/made-in-usa.html
more to come tomorrow.. and then power up! (PTO)
Basically.. and EVERYONE has asked "why a 10kw??" welp.. because there's a 85kw Model S in the near future.. and LADWP would not allow us to over size the system without the paperwork of the 2nd EV..
So let's begin...
The best of the best.. SolarWorld 265 Mono's... This is the first stack and I help unload them (well.. they are mine.. paid in FULL!) Fresh from Oregon!
Boxes and boxes of Enphase's...
Main 250a rear with my TOU meter now pushing 100a to garage and side... (HPC)..
Initial racking to start with new PV Quick Mounts (USA Cali made).. Inverters are now installed.. but it's dark out..
http://www.quickmountpv.com/made-in-usa.html
more to come tomorrow.. and then power up! (PTO)