dgpcolorado
Well-known member
Turns out that only the two new Chargepoint units in Ouray are 200 kW. The other two pedestals got the same older units (shared 165 kW) that were there before. Nevertheless, four stalls to choose from is pretty good for a CCS installation in a remote location.
May change if Chargepoint decides to support the Tesla NACS standard, now that Ford and GM have adopted it for future vehicles.
May change if Chargepoint decides to support the Tesla NACS standard, now that Ford and GM have adopted it for future vehicles.