Another site has opened, making the totals 431/114. Either this one or the one yesterday is in Tucumcari, NM (3/1/0) in I-40. Now only the one in Santa Rosa is needed to complete I-40 to ABQ.
paulgipe said:Thanks Dan. There must be something else going on. This affects several charge networks but all in our neck of the woods. Have you talked to the CEC or CARB about this?
Paul
Highlights (as of March 31, 2020):
109 sites active
182 sites with permits submitted
Costs 24% more on average to build in California than elsewhere
Permitting takes 73(!) days on average
Battery storage planned for 100 of the sites (not clear how many have been delivered yet)/quote]
WetEV said:7809 NE Vancouver Plaza Dr
Vancouver, WA 98663
Wow. That took forever. The chargers have physically been installed there (not sure about wiring, transformer and the rest) since mid-Nov 2019.WetEV said:971 Blossom Hill Rd.
San Jose, CA 95123
GRA said:Current totals are 435/119, so it appears that one more site has opened so ewhere, a d there must also be another coming soon.