Do we know the gauge of wire from the "control box" to the J1772 handle? Is it suitable for 30A? 24A? 20A? 16A?
Aside from modifying the PWM control signal, what are other limiting factors in the box that would prevent you from going all the way to 30A?
( I assume 30A is the hard limit due to the UL certification of the actual J1772 plug used. )
Obviously the current version of the Leaf means that rates over 16A are of marginal interest, but I wonder if the components in the box and cables are of suitable capability to support 6.6kW for future Leaf's and other 6.6kW capable vehicles?
( In my case being able to charge the RangerEV at full rate would be very handy. )
Aside from modifying the PWM control signal, what are other limiting factors in the box that would prevent you from going all the way to 30A?
( I assume 30A is the hard limit due to the UL certification of the actual J1772 plug used. )
Obviously the current version of the Leaf means that rates over 16A are of marginal interest, but I wonder if the components in the box and cables are of suitable capability to support 6.6kW for future Leaf's and other 6.6kW capable vehicles?
( In my case being able to charge the RangerEV at full rate would be very handy. )