trentr
Well-known member
Hello,
I wanted to ask the forum before calling PG&E. Is anyone familiar with PG&E's Schedule 9 Time of Use program? I'm trying to decide if I should go with Rate A or B. Currently, my whole house usage rarely goes to tier 2 in a month. So, my rates are mostly $.11 Kwh. As I understand it, if I select Rate A, my whole house rates will be affected depending on time of day. However, if i select Rate B, I will get a separate meter just for the LEAF and my whole house rates will be the same as of now. Is this how E9 works? Who will install the second meter? How much is the cost to install the second meter and is it dedicated only for the EVSE/Charger or whatever it is called?
http://www.newrules.org/environment/rules/plugin-electric-vehicles/electric-vehicle-charging-rates
Thanks,
trent
I wanted to ask the forum before calling PG&E. Is anyone familiar with PG&E's Schedule 9 Time of Use program? I'm trying to decide if I should go with Rate A or B. Currently, my whole house usage rarely goes to tier 2 in a month. So, my rates are mostly $.11 Kwh. As I understand it, if I select Rate A, my whole house rates will be affected depending on time of day. However, if i select Rate B, I will get a separate meter just for the LEAF and my whole house rates will be the same as of now. Is this how E9 works? Who will install the second meter? How much is the cost to install the second meter and is it dedicated only for the EVSE/Charger or whatever it is called?
http://www.newrules.org/environment/rules/plugin-electric-vehicles/electric-vehicle-charging-rates
Thanks,
trent