GRA said:
One site is open, #9 for the month and #387 total: San Diego #3 (Urb., I-15 ex. 8). This is the Murphy Canyon QC site johnlocke has been monitoring.
The CCS chargers are open but not the combined Chadeno/CCS station. Took a much closer look at the CCS stations. There are two cables on each station labeled 1 and 2. They are very short, maybe 8-10 ft. Rated at 150KW for each. You would need to pull in such that the charging port is next to the station. The 240VAC station is open as well. I can only guess that one cable is for cars with the charge port on the left while the other is for cars with charge port on the right. I doubt that either cable is long enough to reach across the car.
The combined station is next to the garden dept. The station is located half way down the parking space with a 4 ft wide no parking area between the station and the EV charging space and faces parallel to the parking space. both the CCS and Chademo cables are short also. If I pull in next to the station as indicated by the parking stripes, the Chadamo cable is too short to plug in to the charge port. In order to use the Chademo cable I'd have to pull in right next to the station and about half way into the parking space with my tail in the traffic lane. If they had put the station in front of the parking space it would have worked much better. It might work for a car with the charge port on the fender depending on which way they pull into the stall
I'll keep monitoring the station to see when the Chademo charger becomes operational. Looking at their pricing schedule, it looks to me that the EVGO station down the road is about the same cost except that EVGO gives me some charge time for my subscription fee where EA doesn't.