TonyWilliams
Well-known member
abasile said:The only downside is that it took longer this time, as the maximum rate of charge has apparently been limited to about 16 kW in order to avoid demand charges. Still, that is about five times as fast as 3.3 kW Level 2 charging.
I'm happy that he's following my recommendations. I had made an offer to take this over from him, and that was one of my requirements prior to handover (sub 20kW power draw).
So, now with the only DC charger in the USA that meets my spec, would you prefer that or shutdown?