AndyH
Well-known member
Lower left corner - EVSE project underway and expected to be ready mid-Feb. Follow link to 2nd prototype board and O-scope of pilot signal. http://modularevpower.com/EVSE_module_development.htmLEAFer said:Andy: I think what kahlepj is talking about is the REVERSE of what you are linking to ... they (SEVA) are going from NEMA (dryer receptacle on the wall) to J-Plug (car). At least that how I read this ...
kahlepj said:Also, we have created a simple adapter that can be used to turn any simple dryer plug or stove outlet into a J1772 Level 2, 6.6kW capable supply station.
Is it true that a pessimist stops searching when they see the first thing wrong while an optimist keeps looking until they find something right? :lol: